The Chicago Conservation Center performed test cleaning on a rear section of the limestone baptismal font, located at the front of the sanctuary. The font is extremely fragile so it was decided to perform all conservation work at Second Presbyterian rather than de-installing the font and removing it to the CCC’s studio.